Projects
Lemos
“Lemos” wind farm, with 6,9 MW installed capacity and 5,4 MW maximum output capacity is located in the Municipalitiy of Thiva, Regional Entity of Viotia and consists of:
- Two (2) Vestas V117 – 3,45 MW wind turbines
- Control Building
Construction works were completed in March 2019 and the wind farm has been since operating, while the estimated yearly production amounts to 16 GWh.